Showing results 1-6 of 6

There is no gap between the bottom of the cladding and a window/door head flashing (gap should be 5 mm)

  • It was not installed correctly when constructed – the gap has been required under E2/AS1 for building work since 1992 to allow draining and drying from behind the cladding

    How to repair

Gap between bottom of cladding and head flashing sealed

  • It was not installed correctly when constructed – the gap has been required under E2/AS1 for building work since 1992 to allow draining and drying from behind the cladding

    How to repair

No head flashing to window/door openings

  • It was not installed when constructed – for a period during the 1970s and 1980s sealant was sometimes used rather than a metal head flashing 

    How to repair

EIFS – leaking through cladding

House is draughty

Straw bale construction – leaking through cladding